The CNG conversion kit installation report
The installation is about 90% complete. The high pressure line
from the tank to the pressure regulator and the filler fitting still
need to be installed, as well as some wiring. Everything is
tucked in behind the engine - it's quite clean looking.
from the tank to the pressure regulator and the filler fitting still
need to be installed, as well as some wiring. Everything is
tucked in behind the engine - it's quite clean looking.
Below is the trunk area showing the
6.3 gge tank that holds the CNG fuel:
6.3 gge tank that holds the CNG fuel:
Below is the trunk with the black felt velcro-ed
up and around the tank:
up and around the tank:
I will report to you how it runs soon.